Skip to content

Pull requests: openshift/ci-docs

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Document FBC catalog builds and OLM v1 testing workflows approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#598 opened May 15, 2026 by kaovilai Member Loading…
docs: replace "ephemeral cluster" with "Bonfire host cluster" in namespace workflow ok-to-test Indicates a non-member PR verified by an org member that is safe to test.
#592 opened Apr 6, 2026 by redhat-chai-bot Loading…
Add example source IP approved Indicates a PR has been approved by an approver from all required OWNERS files. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#567 opened Dec 4, 2025 by bear-redhat Contributor Loading…
Add documentation for allow_pre_post_step_overrides safety flag approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#560 opened Oct 15, 2025 by deepsm007 Contributor Loading…
Secret Manager CLI approved Indicates a PR has been approved by an approver from all required OWNERS files.
#540 opened May 29, 2025 by psalajova Contributor Loading…
ProTip! no:milestone will show everything without a milestone.