Milestones
List view
Post-0.2.0. Work blocked on something outside the code, needing a design decision, or too broad to ride along: harnesses not installed on the fleet host, changes waiting on the schema mechanism, and the wide output-shape rework.
No due date•1/2 issues closedThe tool becoming coherent. Everything currently in flight, the dashboard and inbox removal chain, the watcher delivery path, and the small fixes that need no decision from Atqa.
No due date•106/107 issues closed