refactor(usb): dynamic endpoint descriptor generation #7736
linux.yml
on: pull_request
build-linux
5m 47s
go-mod-tidy
4m 48s
assert-test-linux
7m 6s
test-linux-build
1m 1s
Matrix: build-linux-cross
Annotations
9 errors
|
test-linux-build
Canceling since a higher priority waiting request for Linux-refs/pull/5405/merge exists
|
|
test-linux-build
The operation was canceled.
|
|
build-linux-cross (arm64)
Canceling since a higher priority waiting request for Linux-refs/pull/5405/merge exists
|
|
build-linux-cross (arm64)
The operation was canceled.
|
|
build-linux-cross (arm)
Canceling since a higher priority waiting request for Linux-refs/pull/5405/merge exists
|
|
build-linux-cross (arm)
The operation was canceled.
|
|
assert-test-linux
Canceling since a higher priority waiting request for Linux-refs/pull/5405/merge exists
|
|
assert-test-linux
The operation was canceled.
|
|
Linux
Canceling since a higher priority waiting request for Linux-refs/pull/5405/merge exists
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
tinygo0.42.0-dev.linux-amd64.tar.gz
|
171 MB |
sha256:787ee2630989281a502f2949e3dafdabb0ba4927fb72f24709d4903b53e734f8
|
|
|
tinygo_0.42.0-dev_amd64.deb
|
171 MB |
sha256:25c136a97ed9c12780b88f9046fbb58ce79c527b060b136ecd3927d1fb6ab6b2
|
|