Skip to content

chore(deps): update docker/build-push-action action to v7 (#64) #15

chore(deps): update docker/build-push-action action to v7 (#64)

chore(deps): update docker/build-push-action action to v7 (#64) #15

Triggered via push April 5, 2026 04:12
Status Failure
Total duration
Artifacts

This workflow graph cannot be shown

A graph will be generated the next time this workflow is run.

Annotations

1 error
Invalid workflow file: .github/workflows/docker-build-and-push-multiarch.yaml#L1
(Line: 18, Col: 13): Unexpected symbol: '"pull_request"'. Located at position 22 within expression: github.event_name != "pull_request", (Line: 27, Col: 13): Unexpected symbol: '"release"'. Located at position 22 within expression: github.event_name == "release", (Line: 60, Col: 17): Unexpected symbol: '"pull_request"'. Located at position 22 within expression: github.event_name != "pull_request"