Mathematical optimizer

Modular runtime

Official Compose deployments run ghcr.io/srcfl/ftw-optimizer separately from core. The worker listens on /run/ftw-optimizer/optimizer.sock and negotiates protocol v1 plus champion, recourse, and multistage features. Core owns request construction and validates every candidate with ValidatePlan; the optimizer receives no telemetry access, secrets, hardware access, /app/data, or network access.

planner.optimizer_transport accepts auto, unix, or process. Compose uses auto, which tries the sidecar and falls back to the bundled worker during the migration window. Failure of both Python transports uses the Go DP planner.

The primary MPC engine is a local Python worker built with CVXPY. HiGHS solves linear and mixed-integer models; CLARABEL is available for continuous convex models. The Go host remains responsible for forecasts, configuration, safety validation, plan persistence, and dispatch.

Process boundary

The host starts one long-lived worker:

Go MPC service
  -> versioned JSON planning snapshot
  -> Python / CVXPY model
  -> HiGHS or CLARABEL
  -> candidate plan
  -> Go physics and policy validator
  -> active plan cache

The protocol is JSON Lines on stdin/stdout. It is deliberately local and has no network listener. Worker logs go to stderr. A request includes no credentials or hardware endpoints.

schema_version is mandatory. A worker response must carry the same request_id; mismatched, malformed, late, non-finite, or infeasible responses are rejected as a unit.

Model

Every slot uses the site convention:

grid = house load + PV + curtailment
     + storage charge - storage discharge
     + flexible loads + thermal loads

Positive grid power is import. PV is negative. Storage charging and EV/thermal loads are positive.

The model supports:

  • any number of storage resources with individual energy, power, efficiency, terminal value, cycle cost, deadline, and reserve constraints;
  • any number of flexible loads with continuous or enumerated power steps;
  • bidirectional resources through storage contracts, including V2X reserve and departure targets;
  • first-order thermal states with comfort bands, heat loss, outside-temperature forecasts, continuous power, or discrete compressor stages;
  • PV curtailment as a decision variable;
  • site import/export limits;
  • multiple load/PV scenarios with shared champion schedules;
  • an opt-in storage-only recourse shadow with a shared executable prefix;
  • expected cost plus configurable CVaR tail risk.
  • optional commercial_constraints_v1 inputs for time-varying upward/downward reserve power and energy, backup energy, robust P10/P90 site limits, throughput degradation cost, and demand-charge windows. These fields extend optimizer protocol v1 additively; workers advertise support through the commercial_constraints_v1 handshake feature before a caller may use them.

If live storage energy starts outside a configured operating band, the initial violation is treated as a recoverable state rather than an invalid request. It may never worsen, recovery is prioritized before economics, and the bound becomes hard as soon as the trajectory returns inside it. Physical bounds of zero and full capacity remain hard throughout.

The Go integration sends every online home battery as a separate storage resource, including its live SoC and configured charge/discharge limits. The existing aggregate fleet safety limit is distributed proportionally across the online devices. Dispatch still receives one aggregate battery target because the control layer already allocates that target across the fleet.

Battery and grid direction binaries are introduced only when required by the economics, such as negative import prices or an import/export price inversion. Discrete EV and thermal steps always make the strict model a MILP. This keeps ordinary battery-only planning convex without allowing artificial simultaneous charge/discharge cycles in the edge cases where losses are profitable.

Objective priority

Planning is lexicographic:

  1. Minimize normalized storage-bound recovery, deadline shortfall, and comfort-band violation.
  2. Lock that service optimum.
  3. Minimize expected import cost minus export revenue, plus CVaR risk and cycle cost, minus terminal storage value and configured PV preference.

This means an expensive but feasible EV deadline or comfort requirement wins over energy cost. When a requirement is physically infeasible, the plan returns the smallest possible shortfall instead of returning no plan.

Forecast risk

When the PV twin exposes a residual standard deviation, Go sends three shared- decision scenarios:

Scenario Probability PV
base 0.60 current forecast
downside 0.25 max(0, forecast - k*sigma)
upside 0.15 forecast + k*sigma during daylight

The default CVaR weight is 0.15 at alpha 0.90. Setting optimizer_cvar_weight: 0 explicitly disables tail-risk cost. If the Python engine fails, the Go-DP fallback receives the previous downside-only forecast, so an optimizer outage does not weaken the existing PV reserve behavior.

Solver cascade

  • HiGHS is primary for LP and MILP.
  • CLARABEL can be selected or used after a HiGHS failure only when the model has no integer variables.
  • The in-process Go DP is the final operational fallback.

When Python produces a valid active plan, the Go DP also evaluates the downside-PV fallback input as a diagnostic shadow. The shadow never reaches dispatch. plan.dp_shadow records its horizon cost, first action, mean/max battery-power difference, and direction-disagreement count. If the Python worker or Go validator fails, the same DP path stops being a shadow and becomes the active fallback for that replan.

The active plan exposes engine, backend, formulation, status, objective, service slack, solve time, MIP gap, scenario count, and fallback reason under plan.solver. The same metadata is persisted in planner diagnostics.

Go validation

Before activation, Go independently replays:

  • slot identity and duration;
  • finite numeric values;
  • aggregate and per-device battery power and energy transitions with charge/discharge efficiency;
  • every loadpoint's allowed step and energy/SoC transition;
  • PV curtailment bounds;
  • post-curtailment mode limits (grid_export + curtailment cannot exceed the original PV surplus in passive modes);
  • site power balance;
  • planner-mode policy;
  • fuse/import/export limits;
  • raw per-slot and total cost.

Validation uses tight numerical tolerances only. It does not clamp or repair a solver result; an invalid plan falls back in full.

Every accepted Python plan records two non-dispatching Go-DP references. The dp_shadow uses downside PV and remains the conservative fallback comparison. dp_evaluation_shadow uses the exact same base forecast as Python; use this field for planned-cost and first-action comparisons between engines.

With optimizer_recourse_shadow: true, the worker also solves a storage challenger. optimizer_challenger_policy: recourse keeps the two-stage reference. multistage constructs a hierarchical scenario tree from observed net-power and PV/load history, reduces large ensembles with weighted net-energy/PV trajectory medoids, and ties far-horizon actions into move blocks. Decisions become scenario- specific only after their tree node branches; the first slot is shared by default. Service-risk CVaR is minimized before expected economic cost. The same worker process solves champion and challenger sequentially. A stateful evaluator then advances both policies over identical realized house load and PV with independent virtual storage energy. The accumulated raw and terminal-energy-valued cost, SoC, and clamp counts are stored under shadow_evaluation. Flexible EV/thermal contracts pause this challenger until their counterfactual state is modeled equivalently. Both policies carry an explicit policy_version; changing it or the planner mode starts a new score run instead of mixing incompatible references.

Challenger hierarchy

The active champion uses one shared 48-hour asset schedule across all PV scenarios and adds CVaR risk cost. That is deliberately conservative, but it can reserve energy twice: once through all-scenario feasibility and again through CVaR. The storage-recourse experiment remains the optimistic two-stage reference. The storage-multistage-v1 shadow is the production candidate: it uses a hierarchical information tree, 15-minute near-horizon decisions, 30-60-minute move blocks farther out, scenario reduction, and lexicographic service CVaR. Since MPC replans every 15 minutes, only the common first action is executable.

Promote a multistage formulation only after rolling-origin replay shows lower realized cost without more mode, grid-limit, or SoC violations. Tune scenario probabilities, PV spreads, CVaR weight, and terminal energy price against forecast residuals from each installation rather than one fixed global value. The same-input DP evaluation shadow and two-stage recourse lower bound remain references for those experiments.

The normal continuous battery model is assembled directly as a sparse HiGHS LP. The CVXPY reference and fallback is DPP-compliant and retained once per warm-worker topology, so repeated fallback solves reuse canonicalization. For eligible continuous arbitrage ensembles above the decomposition threshold, auto may use quadratic Progressive Hedging with a reported non-anticipativity residual. Discrete or otherwise ineligible models are reduced to the threshold and solved exactly by HiGHS through CVXPY.

The compact extensive form creates charge, discharge, and curtailment actions once per information node and move block instead of copying them per scenario and joining the copies with equalities. With ordinary tariffs auto is an LP; negative import prices or export compensation above import cost activate the corresponding charge/discharge or meter-flow binary guard.

The wider method assessment and promotion gate live in optimizer-method-review.md.

The direct highspy path is parity-tested against the CVXPY model. On an ARM64 Pi, eight stored live snapshots measured 125,072 KiB peak RSS and 0.97 s warm median, down from 223,096 KiB and 1.14 s for the cached CVXPY extensive form; its cold model solve fell from 24.8 s to 0.81 s. CVXPY remains loaded because it also runs the champion and handles exact binary guards, but the large cached multistage graph is avoided. The worker idle timeout still releases all Python and solver memory between planning bursts.

Configuration

planner:
  enabled: true
  engine: python                 # default; dp is emergency rollback
  optimizer_solver: HIGHS
  optimizer_formulation: auto    # auto | milp | relaxed
  optimizer_timeout_s: 30
  optimizer_idle_timeout_s: 120  # stop the warm worker after two idle minutes
  optimizer_mip_rel_gap: 0.005
  optimizer_cvar_weight: 0.15
  optimizer_cvar_alpha: 0.90
  optimizer_recourse_shadow: false
  optimizer_recourse_non_anticipative_slots: 1
  optimizer_challenger_policy: multistage
  optimizer_multistage:
    scenario_limit: 12
    branch_interval_slots: 4
    branch_horizon_slots: 48
    max_branching: 2
    near_horizon_slots: 16
    mid_horizon_slots: 96
    mid_block_slots: 2
    far_block_slots: 4
    service_cvar_weight: 1.0
    service_cvar_alpha: 0.95
    economic_cvar_weight: 0
    decomposition_threshold: 20
    decomposition_method: auto

optimizer_command may point at a different Python executable. It is an executable path, not a shell command. optimizer_dir overrides the module directory. The corresponding environment overrides are FTW_OPTIMIZER_PYTHON and FTW_OPTIMIZER_DIR.

optimizer_idle_timeout_s defaults to 120 seconds. The worker stays warm during reactive planning bursts and exits after that much idle time, releasing CVXPY and solver memory until the next replan. Set a longer value when cold Python startup latency matters more than resident memory.

The official container includes the pinned primary solver packages. Native release archives include the Python package; install it with:

python3 -m venv optimizer/.venv
optimizer/.venv/bin/pip install ./optimizer

Then set optimizer_command to optimizer/.venv/bin/python, or export FTW_OPTIMIZER_PYTHON.

Replay

Every successful mathematical plan stores its exact versioned request as optimizer_input in the diagnostic snapshot. Replay it without touching live dispatch:

ftw-optimizer-replay diagnostic.json --solver HIGHS
ftw-optimizer-replay diagnostic.json --solver CLARABEL --formulation relaxed

The replay output contains the candidate plan and solver metadata. It does not write state or send commands.

Historical backtest

ftw-optimizer-backtest exports a stratified sample of persisted planner diagnostics using read-only HTTP GETs, then solves the resulting dataset fully offline:

ftw-optimizer-backtest export \
  --api-base http://energy-host:8080 \
  --days 30 --samples 200 --output /tmp/mpc-backtest.jsonl

ftw-optimizer-backtest run \
  --input /tmp/mpc-backtest.jsonl \
  --output /tmp/mpc-backtest-report.json \
  --max-import-w 11040 --max-export-w 11040 \
  --min-arbitrage-spread-ore-kwh 30

An optional --realized-csv accepts timeseries_15m.csv from GET /api/research/load/dump. It reprices each first-slot battery decision against actual PV, household load, EV/V2X power, and prices, deduplicating multiple reactive replans in the same bucket.

The forecast-horizon comparison is not realized savings: horizons overlap and use the forecasts preserved in each diagnostic. The realized first-slot view is a one-step counterfactual and does not reproduce inner-loop dispatch feedback. Legacy snapshots with an active loadpoint are skipped because the old diagnostic schema did not persist the complete vehicle contract. Historical scenario distributions were also not persisted, so CVaR is disabled for these replays. These limitations are emitted in every report.

Development

make optimizer-install
make optimizer-test
make test

make test runs Python model tests and the Go-to-worker integration test. The 48-hour scenario test covers 192 slots, three PV scenarios, storage dynamics, CVaR, and site limits.