test: harden client tool continuation coverage #2068
ci.yml
on: pull_request
CI scope
1m 1s
Matrix: examples-chat-e2e
Library — lint / test / build
Website — lint / build
Cockpit — build / test
Cockpit — build all examples
Cockpit — representative capability smoke
Cockpit — secret-gated integration
Cockpit — deploy smoke dry-run
Website — e2e
0s
examples/chat — e2e
0s
ag-ui demo → Vercel
0s
Matrix: cockpit-e2e
CI — required
3s
Production smoke
0s
Annotations
13 errors
|
CI scope
Canceling since a higher priority waiting request for CI-782 exists
|
|
CI scope
The operation was canceled.
|
|
CI
Canceling since a higher priority waiting request for CI-782 exists
|
|
CI — required
examples/chat — e2e was not selected by scope examples_chat but finished with cancelled.
|
|
CI — required
examples/chat — python smoke was not selected by scope examples_chat but finished with cancelled.
|
|
CI — required
Cockpit — deploy smoke dry-run was not selected by scope cockpit_deploy_smoke but finished with cancelled.
|
|
CI — required
Cockpit — secret-gated integration was not selected by scope cockpit_secret but finished with cancelled.
|
|
CI — required
Cockpit — representative capability smoke was not selected by scope cockpit_smoke but finished with cancelled.
|
|
CI — required
Cockpit — build all examples was not selected by scope cockpit_examples but finished with cancelled.
|
|
CI — required
Cockpit — build / test was not selected by scope cockpit but finished with cancelled.
|
|
CI — required
Website — lint / build was not selected by scope website but finished with cancelled.
|
|
CI — required
Library — lint / test / build was not selected by scope library but finished with cancelled.
|
|
CI — required
CI scope finished with cancelled; refusing to report CI green.
|