Skip to content

Apply fixes from StyleCI #25

Apply fixes from StyleCI

Apply fixes from StyleCI #25

Triggered via push March 19, 2026 19:16
Status Failure
Total duration 24s
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

28 errors
P8.2 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.2 - L11.* - prefer-stable - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13.0 -> satisfiable by illuminate/contracts[v13.0.0, ..., 13.x-dev]. - illuminate/contracts[v13.0.0, ..., 13.x-dev] require php ^8.3 -> your php version (8.2.30) does not satisfy that requirement.
P8.3 - L11.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.3 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.3 - L11.* - prefer-stable - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13.0 -> satisfiable by illuminate/contracts[v13.0.0, ..., 13.x-dev]. - Root composer.json requires laravel/framework 11.* -> satisfiable by laravel/framework[v11.44.1, ..., 11.x-dev]. - Only one of these can be installed: laravel/framework[v11.44.1, ..., 11.x-dev], illuminate/contracts[v13.0.0, ..., 13.x-dev]. laravel/framework replaces illuminate/contracts and thus cannot coexist with it.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.2 - L11.* - prefer-lowest - ubuntu-latest
Process completed with exit code 2.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13.0 -> satisfiable by illuminate/contracts[v13.0.0, ..., 13.x-dev]. - illuminate/contracts[v13.0.0, ..., 13.x-dev] require php ^8.3 -> your php version (8.2.30) does not satisfy that requirement.
P8.4 - L11.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.4 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.4 - L11.* - prefer-stable - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13.0 -> satisfiable by illuminate/contracts[v13.0.0, ..., 13.x-dev]. - Root composer.json requires laravel/framework 11.* -> satisfiable by laravel/framework[v11.44.1, ..., 11.x-dev]. - Only one of these can be installed: laravel/framework[v11.44.1, ..., 11.x-dev], illuminate/contracts[v13.0.0, ..., 13.x-dev]. laravel/framework replaces illuminate/contracts and thus cannot coexist with it.
P8.4 - L11.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.4 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.4 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.4 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.4 - L11.* - prefer-lowest - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13.0 -> satisfiable by illuminate/contracts[v13.0.0, ..., 13.x-dev]. - Root composer.json requires laravel/framework 11.* -> satisfiable by laravel/framework[v11.44.1, ..., 11.x-dev]. - Only one of these can be installed: laravel/framework[v11.44.1, ..., 11.x-dev], illuminate/contracts[v13.0.0, ..., 13.x-dev]. laravel/framework replaces illuminate/contracts and thus cannot coexist with it.
P8.3 - L11.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.3 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.3 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.2 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.2 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.4 - L11.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_2_11____2" failed
P8.4 - L11.* - prefer-stable - windows-latest
The operation was canceled.