Need of rescheduling feature to be included #123
biodatanet
started this conversation in
Ideas
Replies: 2 comments
|
A rescheduling feature enables users to modify the booked charging timeslot (start and end time) through a BAP-initiated update request, validated and confirmed by the BPP via on_update. |
0 replies
|
For the error cases - TSD must include following |
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
A rescheduling feature should be allowed to the user in terms of the user being abled to change the timeslot that has been booked for the specific CPO. The user should be able to update the timeslot in terms of start and end time. This is a communication between the BAP and BPP in a peer to peer format.
All reactions