Skip to content

Add tests for visit_Constr and visit_Program coverage in GuaranteedEx… #168

Add tests for visit_Constr and visit_Program coverage in GuaranteedEx…

Add tests for visit_Constr and visit_Program coverage in GuaranteedEx… #168

Re-run triggered March 7, 2026 08:57
Status Failure
Total duration 1m 9s
Artifacts

build.yml

on: push
check-run
6s
check-run
Matrix: build
Indicate completion to coveralls.io
0s
Indicate completion to coveralls.io
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (3.12)
Process completed with exit code 1.
build (3.10)
The strategy configuration was canceled because "build._3_12" failed
build (3.10)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_12" failed
build (3.13)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_12" failed
build (3.9)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_12" failed
build (3.11)
The operation was canceled.
build (3.14)
The strategy configuration was canceled because "build._3_12" failed
build (3.14)
The operation was canceled.