Details
Fix the failing CI pipeline on main (commit 8d5af18). Build, lint (biome + eslint + clippy), and tests must all pass before any v1.0 tag can be cut.
The current pipeline has critical failures preventing release readiness. All three checks must be stable and green.
Acceptance Criteria
Details
Fix the failing CI pipeline on main (commit 8d5af18). Build, lint (biome + eslint + clippy), and tests must all pass before any v1.0 tag can be cut.
The current pipeline has critical failures preventing release readiness. All three checks must be stable and green.
Acceptance Criteria