Skip to content

chore: migrate to uv #44

chore: migrate to uv

chore: migrate to uv #44

Triggered via pull request June 5, 2025 13:51
Status Failure
Total duration 52s
Artifacts

test.yaml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (3.8)
Process completed with exit code 1.
test (3.13)
The operation was canceled.
test (3.13)
The strategy configuration was canceled because "test._3_8" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_8" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_8" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_8" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_8" failed