Skip to content

chore: pin vergen transitive dependency to 9.0.6 #251

chore: pin vergen transitive dependency to 9.0.6

chore: pin vergen transitive dependency to 9.0.6 #251

Triggered via pull request January 27, 2026 23:56
Status Failure
Total duration 1m 5s
Artifacts

build.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
cargo +1.85 test (ubuntu-latest)
Process completed with exit code 101.
cargo +stable test (windows-latest)
The strategy configuration was canceled because "test.ubuntu-latest_1_85" failed
cargo +stable test (windows-latest)
The operation was canceled.
cargo +1.85 test (windows-latest)
The strategy configuration was canceled because "test.ubuntu-latest_1_85" failed
cargo +1.85 test (windows-latest)
The operation was canceled.
cargo +stable test (ubuntu-latest)
The strategy configuration was canceled because "test.ubuntu-latest_1_85" failed
cargo +stable test (ubuntu-latest)
The operation was canceled.