Release modifiable transport requests after successful testing to classify them as final.
- You are in the details of a modifiable transport request that you want to release. For more information, see Displaying Details of Transport Requests.
- You have at least the authorization of the TransportOperator role. For more information, see Security.
-
Choose Release.
-
Confirm the dialog box.
You've released the transport request. Its lifecycle status changes to Released. You can no longer modify the transport request.
In the first-level nodes, the transport request is added to the import queues in an Initial import status and a Final mode.
If the transport request was previously tested in follow-on transport nodes, it gets a Transient import status in these import queues, and remains in the Test mode, for traceability reasons.
Objects that were imported during the test remain in the tenant.