Skip to content

Commit 5f49527

Browse files
update link
1 parent a4aaca2 commit 5f49527

1 file changed

Lines changed: 1 addition & 1 deletion

File tree

learn-pr/device-partner-university/deploy-windows/includes/2-phased-approach.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -1,6 +1,6 @@
11
Throughout this module, we refer to deployment rings and various project phases. Some of these terms are often used interchangeably, but for this module, we use the following definitions:
22

3-
- **Proof of Concept (PoC)**: An optional phase often performed in a lab environment. It’s most helpful in the earliest stages of a project to test basic functionality and assumptions. This phase is sometimes called a limited pilot and is covered in the [Prepare phase](placeholderURL).
3+
- **Proof of Concept (PoC)**: An optional phase often performed in a lab environment. It’s most helpful in the earliest stages of a project to test basic functionality and assumptions. This phase is sometimes called a limited pilot and is covered in the [Prepare phase](/training/modules/prepare-windows/).
44
- **Pilot**: The first phase you perform in the production environment. Use it to test the wider infrastructure, connectivity, and application compatibility.
55
- **Broad deployment**: One or more further deployment phases in the production environment, called rings. In Windows Autopatch, these rings are named first, fast, and broad. Eventually they target most of the estate.
66

0 commit comments

Comments
 (0)