Currently, when Data/Schema tabs are switched, it requires a long waiting time to rebuild a graph of a large schema in the Diagram View. Since the tabs need to be switched often for validation adjustment, it would be nice to keep the graph when switching tabs rather than rebuilding it every time.
Currently, when Data/Schema tabs are switched, it requires a long waiting time to rebuild a graph of a large schema in the Diagram View. Since the tabs need to be switched often for validation adjustment, it would be nice to keep the graph when switching tabs rather than rebuilding it every time.