You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository was archived by the owner on May 5, 2021. It is now read-only.
Copy file name to clipboardExpand all lines: CONTRIBUTING.md
+1-1Lines changed: 1 addition & 1 deletion
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -86,7 +86,7 @@ The sorting from top to bottom in every column reflects the priority for the pro
86
86
87
87
The Product Backlog contains the following columns:
88
88
***Backlog:** Issues that have been identified by the Product Owner to be done in the next sprints. There can be a column for each Scrum Team if it fits the need.
89
-
***Sprint n:** Contain tickets picked by the Product Owner to be done in the named sprint. Text notes are used to separate issues between Scrum Teams. It gives a forecast what might come in the upcoming sprint and it is the starting point for the Sprint Planning. Every ticket the Development Team do not pick into their Sprint Backlog needs to be moved back to the Backlog column or one sprint further.
89
+
***Sprint n:** Contain tickets picked by the Product Owner to be done in the named sprint. Text notes or separate columns are used to separate issues between Scrum Teams. It gives a forecast what might come in the upcoming sprint and it is the starting point for the Sprint Planning. Every ticket the Development Team do not pick into their Sprint Backlog needs to be moved back to the Backlog column or one sprint further.
90
90
***Done:** Tickets that are closed (usually resolved within the running sprint) are moved here **automatically**. The sorting does not represent the priority here any more.
0 commit comments